{"id":40521,"date":"2025-08-21T10:32:40","date_gmt":"2025-08-21T08:32:40","guid":{"rendered":"https:\/\/rtsh.al\/rti\/tr\/?p=40521"},"modified":"2025-08-21T10:32:40","modified_gmt":"2025-08-21T08:32:40","slug":"abnin-bati-balkanlar-icin-buyume-plani-arnavutlukun-ilk-uc-projesi-icin-32-milyon-euro","status":"publish","type":"post","link":"https:\/\/rtsh.al\/rti\/tr\/abnin-bati-balkanlar-icin-buyume-plani-arnavutlukun-ilk-uc-projesi-icin-32-milyon-euro\/","title":{"rendered":"AB&#8217;nin Bat\u0131 Balkanlar i\u00e7in B\u00fcy\u00fcme Plan\u0131: Arnavutluk\u2019un ilk \u00fc\u00e7 projesi i\u00e7in 32 milyon Euro"},"content":{"rendered":"<p>Avrupa Birli\u011fi, Bat\u0131 Balkanlar Yat\u0131r\u0131m \u00c7er\u00e7evesi (WBIF) kapsam\u0131nda finanse edilecek ilk projeler i\u00e7in 87.7 milyon Euro de\u011ferinde bir destek paketi onaylad\u0131. Finansman\u0131n ilk a\u015famas\u0131nda Arnavutluk, \u00fc\u00e7 proje i\u00e7in 32 milyon Euro hibe alacak.<\/p>\n<p>\u0130lk proje, \u00fclke genelindeki 40 y\u00fcksek gerilim trafo merkezini kapsayan enerji iletim sisteminin dijitalle\u015ftirilmesidir. Bu sayede \u015febeke kapasitesi art\u0131r\u0131lacak ve kay\u0131plar azalt\u0131lacakt\u0131r. Projenin toplam de\u011feri 95.3 milyon Euro olup, AB bu projeye 10.5 milyon Euro katk\u0131da bulunuyor. Projenin tamamlanma s\u00fcresi 2030 y\u0131l\u0131 olarak belirlenmi\u015ftir.<\/p>\n<p>\u0130kinci proje, Fierza Hidroelektrik Santrali&#8217;nin yenilenmesidir. Bu yat\u0131r\u0131mla hidroelektrik santralinin \u00f6mr\u00fc 30 y\u0131l daha uzat\u0131lacak, verimlilik % 4, \u00fcretim ise % 10 oran\u0131nda art\u0131r\u0131lacakt\u0131r. Projenin ikinci a\u015famas\u0131, B\u00fcy\u00fcme Plan\u0131 fonlar\u0131ndan 13.6 milyon Euro destek alacak. Toplam yat\u0131r\u0131m de\u011feri ise 64.2 milyon Euro. Bu projenin tamamlanma s\u00fcresi de 2030 y\u0131l\u0131d\u0131r.<\/p>\n<p>\u00dc\u00e7\u00fcnc\u00fc proje, Rrashbull-Tiran\u00eb yeni iletim hatt\u0131 ve Tiran\u00eb \u00c7evre Hatt\u0131d\u0131r. 400\/220 kV\u2019luk iletim hatt\u0131 in\u015faat\u0131, ba\u015fkentin artan enerji talebini kar\u015f\u0131lamak i\u00e7in \u015febekenin geni\u015fletilmesini hedefliyor. Projenin toplam de\u011feri 61.1 milyon Euro, AB katk\u0131s\u0131 ise 8 milyon Eurodur. Bu projenin bu y\u0131l i\u00e7inde tamamlanmas\u0131 bekleniyor.<\/p>\n<p>AB&#8217;nin Bat\u0131 Balkanlar i\u00e7in haz\u0131rlad\u0131\u011f\u0131 B\u00fcy\u00fcme Plan\u0131\u2019n\u0131n ilk projeleri, neredeyse t\u00fcm b\u00f6lge \u00fclkelerinde temiz enerji alan\u0131nda yo\u011funla\u015f\u0131yor. Arnavutluk, bu projelerden en fazla faydalanan \u00fclkelerden biri konumunda.<\/p>\n<p>Di\u011fer \u00dclkelerle Kar\u015f\u0131la\u015ft\u0131rma:<\/p>\n<p>Arnavutluk : Bu a\u015famada toplam de\u011feri 220 milyon Euro&#8217;yu a\u015fan \u00fc\u00e7 b\u00fcy\u00fck projeye sahip, AB katk\u0131s\u0131 33 milyon Euro.<br \/>\nKarada\u011f: B\u00fcy\u00fcme Plan\u0131\u2019n\u0131n ilk a\u015famas\u0131nda toplam 54 milyon Euro\u2019luk projelere sahip, AB katk\u0131s\u0131 10 milyon Euro\u2019nun alt\u0131nda.<br \/>\nS\u0131rbistan: Enerji \u00e7e\u015fitlili\u011fi (hidro + g\u00fcne\u015f) odakl\u0131 iki projeye sahip. Toplam de\u011fer 186 milyon Euro, AB katk\u0131s\u0131 yakla\u015f\u0131k 41 milyon Euro.<\/p>\n<p><em>\/ Aida Vishko \/\u00a0<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Avrupa Birli\u011fi, Bat\u0131 Balkanlar Yat\u0131r\u0131m \u00c7er\u00e7evesi (WBIF) kapsam\u0131nda finanse edilecek ilk projeler i\u00e7in 87.7 milyon Euro de\u011ferinde bir destek paketi onaylad\u0131. Finansman\u0131n ilk a\u015famas\u0131nda Arnavutluk, \u00fc\u00e7 proje i\u00e7in 32 milyon Euro hibe alacak. \u0130lk proje, \u00fclke genelindeki 40 y\u00fcksek gerilim trafo merkezini kapsayan enerji iletim sisteminin dijitalle\u015ftirilmesidir. Bu sayede \u015febeke kapasitesi art\u0131r\u0131lacak ve kay\u0131plar azalt\u0131lacakt\u0131r. [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":39757,"comment_status":"open","ping_status":"open","sticky":true,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-40521","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-haberler"],"_links":{"self":[{"href":"https:\/\/rtsh.al\/rti\/tr\/wp-json\/wp\/v2\/posts\/40521","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rtsh.al\/rti\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rtsh.al\/rti\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rtsh.al\/rti\/tr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/rtsh.al\/rti\/tr\/wp-json\/wp\/v2\/comments?post=40521"}],"version-history":[{"count":1,"href":"https:\/\/rtsh.al\/rti\/tr\/wp-json\/wp\/v2\/posts\/40521\/revisions"}],"predecessor-version":[{"id":40524,"href":"https:\/\/rtsh.al\/rti\/tr\/wp-json\/wp\/v2\/posts\/40521\/revisions\/40524"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rtsh.al\/rti\/tr\/wp-json\/wp\/v2\/media\/39757"}],"wp:attachment":[{"href":"https:\/\/rtsh.al\/rti\/tr\/wp-json\/wp\/v2\/media?parent=40521"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rtsh.al\/rti\/tr\/wp-json\/wp\/v2\/categories?post=40521"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rtsh.al\/rti\/tr\/wp-json\/wp\/v2\/tags?post=40521"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}