Balluku, Power Transmission System Operator groups on duty, despite extremely difficult terrain and deteriorating weather

The Deputy Prime Minister, at the same time as the Minister of Infrastructure and Energy, Belinda Balluku informs that the working groups of the Transmission System Operator (OST) are engaged in the field throughout the country to respond to breakdowns and provide power supply.
Deputy Prime Minister, Balluku said that all OST employees are on full alert until the situation normalizes.
“At the top of the task despite the extremely difficult terrain and the deteriorating weather,” said Balluku, as she shared a video of the work in the field despite the difficult conditions.
During the last 48 hours, our country was engulfed by intense rains, which caused problems in the supply of energy in some areas of the country, especially in the north.
OST teams are on the ground for any breakdown, providing energy supply to citizens.
/a.p./



