Minister of Infrastructure Balluku inspects the works of Orikum-Dukat road

The Minister of Infrastructure Belinda Balluku has inspected the works for the construction of the Orikum-Dukat road axis, where 34% of the works have been completed so far. Road users said Balluku, will have a side of the road paved and measures are being taken not to create difficulties in the circulation of vehicles during the summer season.
“At the moment we are moving fast to close with the conglomerate layer until the beginning of the part of the new trail, which, as you said, follows the river trail, ie the river bed. All these together, ie the Vlora bypass, the part of the trail that we are inspecting today and the small bypass that we have made at the entrance of the tunnel pipes, will be all ready to be used by citizens and visitors of the south starting from the first week of July “, said Balluku.
Time is being taken before the influx of visitors to the south is added and the works will focus on the new trail.
“We must not forget that in the summer season we have the problem of heavy traffic and certainly do not want to disturb all drivers and all visitors. So, during the summer season, regarding this work, we will work only on the new route, that is, only on following the river bed in the other 3 construction sites that are functional “, underlined Balluku.
Also present at the inspection was the head of ARA, Evis Berberi, who provided details regarding the pace of works.



