Spectacular view of the bridge over the river Drin on the Road of Nation

Albanian Prime Minister, Edi Rama published a photo of the new bridge over the Drin, through which its spectacular view can be seen.
The team of RTSH Kukës saw closely how the work process continues. It will take a few more days for the bridge to be completed.
The process for the relocation of the New Bridge over the Drin continues on its last stage.
Less than 50 meters are left from the final distance of the relocation, which is expected to be completed at the beginning of the next week.
To this process, Prime Minister Rama dedicated a post on social networks, a photo taken in the evening hours which in fact has created another panoramic image over the Lake Fierza in particular and the Road of the Nation in general, concluding the last problematic link of this important artery of the nation.
The bridge is one of the most unique in the region, with a total length of 310 meters and a 50-meter height of the arch from the base of the bridge.
The cost of the construction of the bridge amounts to more than 30 million Euros. An Italian company known in the field of such metal bridge constructions was contracted for its construction.
The New Bridge over the Drin is built of steel and weighs at least 5,000 tons. It has four dedicated lanes and best standards, including decorative lighting.
/a.p./




