The construction of Shkodër’s new dock on the lake adds to the tourist offer

At the entrance to Shkodër city, close to the old Buna Bridge, work has begun on the construction of the new dock.
The Shkodër Mayor Benet Beci shows views from the work on the new dock, which provides another sailing opportunity, thus enriches the tourist offer and promoting business in the area.
The new dock be 60 to 20 meters and will also have a floating platform of 59 to 4 meters, quite suitable for tied boats.
The infrastructure built by the docks project in Shkodër is a step to a lake filled with boats, ferries and canoes, always respecting the unique environmental values of the lake.
The value of this pier is around 1 million Euro and will be built within 3 months.
The construction of three piers in Shkodër, the cross-border navigation and roads alongside the
Lakeside villages in Montenegro will open a completely different perspective to the tourism in the area.
/a.p./




