The road segment Orikum-Dukat opens to traffic

Albanian Deputy Prime Minister, at the same time the Minister of Infrastructure and Energy, Belinda Balluku, accompanied by the director of the Albanian Road Authority, Evis Berberi inspected the works for the construction of the Orikum-Dukat road segment.
Balluku said that the work is proceeding at a fast pace and the opening of a segment of this segment is ready. “The road is of category C2 and its construction has provided solutions to the problems related to road safety, as the curves that have been a concern for road users for years have been eliminated.”
Balluku added that works are continuing for it the entire length, which is expected to be fully completed in February next year, within the stipulated time.
Balluku pointed out that the entire infrastructure of the South area, starting from the Fier bypass, then the Fier-Levan-Vlorë road, the airport road and Orikum-Dukat roadand obviously connecting to the Llogara Tunnel, are among the best studied parts in Albania, in regards.
“In June of 2024, all these road axes in the south of the country will be completed,” states Balluku, as pointing out that the same working pace is being kept with Corridor 8, from Elbasan to Qafë-Thanë, adding that the procedure for the 2nd lot and for the bypass of Elbasan, while working for the bypass of Librazhdi, at the same time,” Balluku underlined
“Investments in infrastructure are being developed to connect the North with the South, Albania with the region and to develop the country”, concluded Deputy Prime Minister.
/a.p./




